Specialist HV civil works from 11kV to 132kV — reinforced concrete, transformer bunds, ducting and substation civils delivered safely for DNOs and Tier 1 contractors across the UK.

01

What we do.

From initial excavation through to full site reinstatement, we provide every element of HV civil infrastructure construction — self-delivered, to specification, on programme.

  1. 01

    HV Utility Infrastructure Works (11kV–132kV)

    Specialist civil and structural works within live grid substations and restricted compounds. Fully compliant and certified operations for major UK networks.

    • 11kV–132kV
    • Live Substation entry
    • Grid infrastructure
    • UKPN & SSE compliant
  2. 02

    Reinforced Concrete Foundations, Plinths & Transformer Bunds

    Cast in-situ weight-bearing foundations, equipment plinths, and environmental oil-containment bund structures built to strict client design and standards.

    • Transformer bunds
    • Raft foundations
    • Oil containment
    • Shuttering & steel fixing
  3. 03

    Excavation, Trenching & Duct Installation

    Controlled excavations around live services, route trenching, and utility duct network formation. Supervised by qualified banksmen and CPCS operators.

    • Trenching & ducting
    • Excavator CPCS
    • Service avoidance
    • Banksman supervised
  4. 04

    Cable Pulling & Associated Civil Works

    HV and LV cable management and installation using NPORS-certified Grundowinch winching systems, including concrete encasements and traceable cable pulling logs.

    • HV & LV pulling
    • Grundowinch NPORS
    • Concrete encasement
    • Traceable schedules
  5. 05

    Site Preparation & Enabling Works

    Compound installations, temporary access roadways, security fencing installation, site clearance, and utility service connections prior to core construction works.

    • Compound setup
    • Access routes
    • Security fencing
    • Site clearance
  6. 06

    Skilled Labour & Specialist Resource Solutions

    Providing fully accredited site resources, including banksmen, competent plant operators, shuttering carpenters, and SMSTS-qualified project managers.

    • CSCS skilled workforce
    • Substation entry
    • SMSTS site managers
    • Plant operators
  7. 07
    In addition

    Precast Transformer Blast Walls & Protection

    Supply and precision installation of fire-protection precast blast walls (minimum 4-hour fire resistance rating) and surrounding reinforced concrete protecting structures.

    • Precast walls
    • Blast walls
    • 4-Hour fire rating
    • Asset protection
02

Technical depth,
across every discipline.

Eleven years of high-voltage civil works means our team has the technical knowledge and site experience to work safely and precisely on even the most complex substation environments.

Excavation & Trenching

Excavation, trenching and formation works for cable routes and substation structures and compounds. Controlled operations around live services with full banksman supervision and CPCS-certified plant operators.

  • Compound formation & levelling
  • Cable route excavation
  • Reinstatement to original standard
  • Service detection & avoidance

Concrete Works

Cast in-situ reinforced concrete foundations, transformer bases, plinths and bunded structures. High-strength structural concrete to UK Power Networks and client standards with dimensional control throughout.

  • Transformer bunds & plinths
  • Raft foundations
  • Shuttering & steel fixing
  • Oil containment systems

Substation Civils

Structural alterations, security and standard fencing and building works within live compounds and restricted HV sites. All operatives hold substation entry authorisation and site-specific inductions.

  • Live compound works
  • Security fencing systems
  • Structural modifications
  • Substation entry authorised

Pre-cast Civils

Installation of pre-cast elements including trough systems, blast and retaining walls, chambers, cover slabs and gate posts. Including 4-hour fire-rated precast walls for transformer asset protection.

  • Trough & chamber installation
  • Blast & retaining walls
  • 4-hr fire-rated walls
  • Cover slabs & gate posts
03

Fully certified.
Properly qualified.

Our team holds a wide range of industry certifications and client-specific authorisations to ensure full compliance and the highest standards on every project.

CPCS Competent Operator

Construction Plant Competence Scheme certification for all plant operators on site.

CSCS Skilled Worker

Construction Skills Certification Scheme cards across the full site workforce.

Grundowinch NPORS Operator

National Plant Operators Registration Scheme certified for cable pulling winch operations.

Excavation Marshall / Banksman

Qualified banksmen on all excavation works ensuring safety around plant and open excavations.

SMSTS — Site Management Safety Training

Site Management Safety Training Scheme for project and site managers overseeing operations.

Substation Entry Authorisation

Client-specific substation entry authorisations for working within live HV compounds safely.

Our continued investment in training reflects our commitment to quality, safety, and excellence across every project we deliver.

CHAS Accredited Contractor
Avetta Certified
04

How we deliver.

Every project follows a structured approach — from initial site visit through to signed handover. No surprises, no shortcuts.

  1. 01

    Survey & Scope

    Site walk, service detection, programme review. We understand the constraints before committing to a plan — live services, access restrictions, DNO requirements.

  2. 02

    Plan & Resource

    Method statements, RAMS, CPP, team allocation and material procurement. Every project is resourced correctly before a single spade goes in the ground.

  3. 03

    Deliver

    Controlled execution to DNO and client standards. Banksman-supervised plant, daily briefings, quality checks at every stage. Dimensional control and concrete finishes to specification throughout.

  4. 04

    Reinstate & Sign-off

    Full site reinstatement, dimensional checks, as-built records and client handover documentation. The site leaves our hands cleaner than we found it.

05

Tender, conversation,
or a coffee on site.

Accreditation
CHAS Accredited Contractor
Certification
Avetta Certified
Values

Quality · Teamwork