Gallery

Mezini Brothers Ltd — Site Photography

The work,
in pictures.

Real site photography from live projects — transformer bunds, raft foundations, cable routes, battery storage infrastructure, and substation enabling works delivered across the UK.

Browse gallery ↓ Get in touch
Scroll ↓
01

Substation Works

Transformer bunds · Raft foundations · Concrete plinths · 11kV–132kV

Radnor T1 & T3 transformer bund — reinforcement steel installation
Radnor T1 & T3 — reinforcement & shuttering Transformer Bund · M Group · 2025
Radnor T1 & T3 — completed concrete bund
Radnor — completed bund M Group · 2025
Transformer bund — oil containment shingle layer
Transformer Bund — oil containment Concrete Works
Peterborough East Grid Substation — rebar for concrete pour
Peterborough East — raft foundation steel Raft Foundation · M Group · 2025
Peterborough East — completed raft foundation
Peterborough East — completed foundation UKPN · 2025
Honington Primary T1 & T2 — reinforcement mesh
Honington Primary — rebar mesh UKPN · 2025
Honington Primary — precast blast walls with 4hr fire rating
Honington Primary — precast fire protection walls 4-Hr Fire Rating · UKPN · 2025
02

Cable & Duct Works

Trenching · Ducting installation · Cable pulling · Concrete encasement

Stirling Way North — cable trench with parallel duct runs
Stirling Way — 500M+ duct installation UKPN Connection · 2023
Wix Primary — cable duct runs in precast base
Wix Primary — FastBase duct routes M Group · 2023
Sealant works — duct sealing at substation
Duct sealing — sealant works detail Civil Works
Sealant works — close-up multi-duct sealing
Sealant works — multi-duct detail Substation Civils
03

Battery & EV Infrastructure

Chandos Road Battery Storage · Tesla Megapack · JSM · £500K · 2022–23

Chandos Road — Tesla Megapack battery storage facility
Chandos Road — Tesla Megapack installation Battery Storage · JSM · £500K · 2022–23
Chandos Road — concrete pad foundations
Chandos Road — pad foundations Reinforced Concrete
04

Site Preparation & Enabling

Compound installation · FastBase pre-fab · Crane lifts · Substation extensions

Wix Primary Substation — completed compound with GRP enclosure
Wix Primary — completed compound M Group · 2023
Crane lift plan — Liebherr LTM1090-4.2 at Canal Bank Acton SSE
Crane lift plan — Liebherr LTM1090 · SSE Canal Bank Acton · SSE
Site preparation — condition on arrival
Site arrival — before works Site Preparation
05

Before & After

Site arrival versus hand-over condition — the Mezini Brothers standard

Before
Before — site condition on arrival
Site arrival condition
After
After — completed works on handover
Completed works — handover
Before
Before — site condition on arrival
Site arrival condition
After
After — completed works on handover
Completed works — handover
Before
Before — site condition on arrival
Site arrival condition
After
After — completed works on handover
Completed works — handover

Whether it's a tender, a site visit, or an initial conversation — we're ready to discuss your project requirements.

Email info@mezinibrothers.co.uk
Contact number Mobile: +44 7767 646 958 WhatsApp: +44 7774 791 590
CHAS Accredited Contractor
Avetta Certified